INFRASTRUCTURE STUDIO

NVIDIA GB300 NVL72

Rack-scale compute. Clear fabric boundaries. One coherent view.

Save a design

Explore here, then create a private datacenter workspace to save your BOM and configuration. Reopen any saved version, revise it and keep its history. Managed datacenter onboarding follows a reviewed design.

Source-backed profilesVersioned designDistinct network planes

EAST–WEST / COMPUTE FABRICCanonical device groups · inspect for identities
Illustrative illumination · no live telemetry
Datacenter readiness · cooling, power & infrastructure

Calculating the site requirements with this design…

Site capacity checks · survey & OEM evidence

Planning targets describe what to provide. Checks below use only explicitly supplied site/OEM limits; estimates cannot pass these checks.

Equipment power & cooling · kW and BTU/h

The current design will show its per-unit and total equipment envelopes here.

    Internet edge & internal services

    Logical HA reservations. Circuit diversity, physical ports and service deployment require review.

    On smaller screens, scroll the connection diagram sideways to read every device.

    Complete infrastructure requirements · BOM dependencies

    Quantified requirements where the inputs permit them. Each line names the evidence needed for an order-ready vendor BOM.

    Required evidence & sourced CDU, PDU and monitoring options

      An unpriced requirements brief, saved on your device and bound to this design revision. Vendor prices, installation sign-off and delivery dates need evidence before an order can be approved.

      Follow the work

      Illustrative flow

      Changing workloads changes placement and highlighted paths on the selected hardware. Local exchange, collective traffic and service access use different boundaries.

      Placement & failure study

      Place work deliberately.

      DESIGN NOTE

      Select equipment or a connection to inspect the complete identities. On a narrow screen, swipe the canvas or focus it and use arrow keys to pan.

      Sources & assumptions ↗
      Design for the planned maximum · growth & pods

      Facility groups are site inputs, not vendor scalable units or network pods. Power, cooling, pathways and shared OOB dependencies still require site review.

      Reference and assumptions · explicit gaps
      Other accelerator references · TPU & AI ASIC

      Vendor product references for an accelerator scope discussion. These need their own platform and interconnect models before an engineering study can be calculated.

      TUNNINET / HPCDesign · Build · Validate · OperateReference planning · no live telemetry

      Theoretical peak compute